Quality Assurance

OG Engineering Ltd use a system of metrics to to ensure compliance with the project scope ,project performance, project requirements and specifications (contract) , project standards and customer demands.

By using both qualitative and quantitative metrics, (quality review, procedures, tests points) OG Engineering Ltd can effectively measure project quality with customer satisfaction. These tests or quality audits will help you predict and verify the achievement of goals and identify need for corrective actions. Additionally, quality assurance tests will help you map quality metrics to quality goals, allowing you to report on the status of quality at periodic project review meetings.

These tests are being used by OG Engineering Ltd to prevent failures and enforcing project correction activities, whenever required.

OG Engineering Ltd quality system which will be operated during the execution of the project whose objective is to audit, monitor, document and approve all the activities of the main contractor, its suppliers and its subcontractors. By these actions OG Engineering Ltd intended to assure meeting with the contract’s and specifications’ requirements.

Quality Control

The QC system is the mean assuring the fulfillment of the requirements of the contract, plans and specs. The QC system is supposed, among others, to assure the carrying out of the following main topics:

  1. Determining clear program of supervision and tests (including methods to identify and assure consistency) to assure that the work processes are effective and the product conforms with the requirements of the specs.
  2. Establishing processes of selecting subcontractors and other suppliers and processes assuring that their products conform with the requirements of the specs before they are integrated in the works.
  3. Implementing processes of  identification, handling and correcting non-compliances in the work processes and the final product qualities. Setting forth ways to improve the work processes to avoid recurrence of the non-compliances.
  4. Maintaining orderly records of all the work processes and the results of the supervision and lab tests activities, in a way enabling clear display of the quality levels achieved.

OG Engineering Ltd specialized in carry out all the above within the project’s timetable and in such a way that the dates of the control activities, the samplings, carrying out the tests, recording and reporting will not delay the work stages and will not cause any delay in the project’s timetable.

Quality control monitors specific project outputs and determines compliance with applicable standards. It also identifies project risk factors, their mitigation, and looks for ways to prevent and eliminate unsatisfactory performance.